NASA Overhauls Artemis Lander Plans, Aims for Moon Landing by 2028
The agency outlined updated mission architectures for SpaceX and Blue Origin while committing to a tight timeline for returning to the lunar surface.
By Brianna Jackson ·

NASA is aiming to put boots on the lunar surface by 2028, detailing on Friday how it plans to modify the mission profiles for its commercial lander partners. The agency laid out a specific roadmap for returning astronauts to the Moon, though the timeline remains aggressive and the technical challenges significant.
Administrator Jared Isaacman stated that the agency possesses the mandate, resources, and stakeholder support to execute this plan. "This is an achievable path we are on right now," Isaacman said. The agency is currently targeting a launch for Artemis III in the summer of 2027, a mission designed to demonstrate docking capabilities with both the Blue Moon and Starship vehicles near Earth. Artemis IV, which would involve an actual landing on the lunar surface, remains scheduled for 2028.
The proposed architecture for SpaceX involves a significant change regarding how astronauts reach the lander. Under the revised plan, the Orion spacecraft will dock with the Starship lunar lander while in high-Earth orbit before transiting to the Moon. This approach eliminates the requirement to dock with Orion in a near-rectilinear halo orbit around the Moon, a task that necessitated more energy and presented other difficulties for SpaceX engineers earlier this year.
The shift in strategy for SpaceX appears to be a direct consequence of the cancellation of the Lunar Gateway earlier this year. By removing the Gateway from the equation, NASA resolved the specific problem SpaceX engineers had raised during meetings in early 2026 regarding the orbital mechanics required for the mission.
For Blue Origin, the mission architecture relies on four launches of the New Glenn rocket. Notably, the plan does not involve any spacecraft-to-spacecraft refueling. Additionally, the Blue Origin plans allow for the possibility of the Blue Moon lander rendezvousing with Orion in low-Lunar orbit.
NASA officials provided these details during a lengthy news conference on Friday. While much of the information regarding these plans has been previously reported, this marked the first time NASA has laid them out in detail and acknowledged substantial changes in the mission architecture.
NASA Administrator Jared Isaacman expressed confidence in the agency's ability to meet these targets, stating, "We have the mandate, we have the resources, and the support from our stakeholders to be able to execute, and that's what we intend to do." This statement reflects an intent to proceed with the outlined schedule despite the complexities involved.
The agency has committed to a hard look at every element of the Artemis Program to seek changes that help lander companies execute and accelerate their plans. While the agency is moving forward with these updated plans, the timeline for achieving a lunar landing by 2028 remains a significant undertaking.
Source: Ars Technica


